Below you will find some of the references where Spæncom has developed, designed and produced concrete units for storage halls.

 Anders Sørensen lagerhaller Anders Sørensen A/S
Spaencom has delivered TTS slabs, walls and facades for the warehouse. The 14,000 sqm. consists of bearing walls in seven rooms to stabilize the large building and to meet fire requirements.
 Show.gif
 Arla Foods lagerhaller Arla Foods
Spaencom has delivered all the units and was responsible for project design and statics included.
The warehouse is built with white exposed facade units, walls, TTS's, ordinary waffles and fire waffles ...
 Show.gif
 Dinex lagerhaller Dinex A/S
Dinex needed a new high bay warehouse to accommodate the increasing number of components. The High bay warehouse is traditionally performed with facade units and TTS roof units with 4.80 m steel slabs between each unit.
 Show.gif
 Harald Nyborg lagerhaller Harald Nyborg
The new warehouses of Harald Nyborg in 8 meter ground clearance was the first building with Spancrete facade units. Also Spancrete and ordinary walls, facades, TTS units, columns and beams are delivered.
 Show.gif
 JYSK_Uldum_003_m._skygge.jpg Jysk
The gigantic warehouse consists of three high-bay warehouses, each of which towers a full 40 meter into the air. Between these three halls two miniload halls of "only" 16 meters are erected.
 Show.gif
 Kolding Havneterminal lagerhaller Kolding Havneterminal A/S
For the 5,200 sqm. warehouses Spancrete units have been used and thus a full utilisation of the building's floor area has been achieved.
 Show.gif
 Netto lagerhaller Netto
For the 52,000 sqm. warehouses / distribution center of Netto in Køge, Spaencom has delivered A-foundations, columns, beams and TTS units.
 Show.gif
 Siemens Wind Power Lagerhaller Siemens Wind Power A/S
An immediate need for more space and a centralization of the activities for the production of windmill blades at Siemens Wind Power A / S in Aalborg, resulted in a building project with three new warehouses which was built in record time.
 Show.gif
 stop lagerhaller Stop 39
Spaencom has delivered and installed all of the concrete units. It concerns TTS slabs, columns, beams, Spanmax box girders, walls and facades.
 Show.gif




Read more ...
Click here for Attractive facade solutions

Please contact us for further information
 
Other references

Office blocks

Industrial and commercial building

Residential housing

Other building projects

Stadiums

Click on the items above for specific references.

 

Spæncom A/STel. 8888 8200Fax 2817 8202info@spaencom.dk

Besøg Consolis