 | Anders Sørensen A/S Spaencom has delivered TTS slabs, walls and facades for the warehouse. The 14,000 sqm. consists of bearing walls in seven rooms to stabilize the large building and to meet fire requirements. |  |
 | Arla Foods Spaencom has delivered all the units and was responsible for project design and statics included. The warehouse is built with white exposed facade units, walls, TTS's, ordinary waffles and fire waffles ...
|  |
 | Dinex A/S Dinex needed a new high bay warehouse to accommodate the increasing number of components. The High bay warehouse is traditionally performed with facade units and TTS roof units with 4.80 m steel slabs between each unit. |  |
 | Harald Nyborg The new warehouses of Harald Nyborg in 8 meter ground clearance was the first building with Spancrete facade units. Also Spancrete and ordinary walls, facades, TTS units, columns and beams are delivered.
|  |
 | Jysk The gigantic warehouse consists of three high-bay warehouses, each of which towers a full 40 meter into the air. Between these three halls two miniload halls of "only" 16 meters are erected. |  |
 | Kolding Havneterminal A/S For the 5,200 sqm. warehouses Spancrete units have been used and thus a full utilisation of the building's floor area has been achieved. |  |
 | Netto For the 52,000 sqm. warehouses / distribution center of Netto in Køge, Spaencom has delivered A-foundations, columns, beams and TTS units. |  |
 | Siemens Wind Power A/S An immediate need for more space and a centralization of the activities for the production of windmill blades at Siemens Wind Power A / S in Aalborg, resulted in a building project with three new warehouses which was built in record time. |  |
 | Stop 39 Spaencom has delivered and installed all of the concrete units. It concerns TTS slabs, columns, beams, Spanmax box girders, walls and facades. |  |